Data center water policy by state

States and counties are writing data center water rules quickly, and the details are scattered across governors' letters, bill trackers, agency pages and county agendas. This page puts them in one place: what is actually in force, what is only proposed or promised, and which public office to ask for the latest update. It is for private well owners and city-water households near a proposed project, and for the journalists, auditors and local officials who follow these fights. For what a real water-supply audit should check, see data center water-supply audits. For how we define a free public county/ZIP band and a licensed parcel score on top of this tracker, see the Household Water Risk Score.

This is general information, not legal advice, and it changes fast. A rule listed here may have been amended since our last check (shown at the bottom of the page). Confirm with the agency before you rely on it. Nothing here can tell you whether any home's water is safe to drink.

On a private well? State groundwater permits and local districts (below) decide whether a data center can pump from your aquifer. Start a baseline record now: document your well before construction and see will a nearby data center affect my well?

On city or county water? Most data centers buy water from a public utility, so your utility's capacity, drought plan and contracts matter as much as state law. Reporting laws in Virginia, New Jersey and Utah are where those volumes start to become public. Background: data centers and water.

How to read this page

Each entry has a status:

Who to ask is a public contact printed on the agency's own page (or an official state resource page). We never guess an email address. When an agency only offers a web form or phone line, we say so. We are asking each agency to confirm the right contact for data center water updates; until they do, treat a contact as "the published office for this topic," not a named data center liaison.

The same data is available as a spreadsheet: CSV · JSON. It lists every source URL.

At a glance

State What's in place Status Who to ask for updates
Texas Grid-connection pause pending ERCOT audit (water sources, use, cooling); TCEQ permit pause; mandatory TWDB water use survey In force (pauses tied to audit) ERCOT: DataCenterImpact@ercot.com · TWDB: waterusesurvey@twdb.texas.gov
Texas Governor-elect's pledge to keep approvals paused until new laws pass Campaign pledge Watch the 2027 Legislature
Utah HB 76: pre-construction and annual water reports for large data centers, published yearly In force (July 1, 2026) Division of Water Rights: waterrights@utah.gov · 801-538-7240
Virginia HB 496 utility reporting of water sold to data centers; cooling limits in Eastern Virginia GWMA In force; rulemaking under way DEQ Office of Water Supply: william.cloe@deq.virginia.gov
New Jersey Semiannual water and energy reports to the BPU In force (Aug. 27, 2026) BPU: Ombudsman@bpu.nj.gov
Arizona Active Management Area well rules; Project Blue wells tied to existing rights In force (general rules) ADWR wells: permit-wells@azwater.gov · (602) 771-8527
Georgia EPD permit above 100,000 gal/day of groundwater; NDA bill In force; bill unclear EPD groundwater: Christine.Voudy@dnr.ga.gov
Minnesota DNR permit above 10,000 gal/day; nonpublic pre-application review for very large data centers In force DNR: info.dnr@state.mn.us · 651-296-6157
Oregon Governor's Data Center Advisory Committee drafting recommendations Proposed datacenter.ac@oregon.gov
Florida Marion and Levy county moratoriums; water management district permits In force Marion County Public Relations: PublicRelations@MarionFL.org · 352-438-2300 · SJRWMD: permitting@sjrwmd.com
Pennsylvania, Idaho Annual DEP reports (PA); cooling-water limit (ID) In force Contacts not yet verified
Iowa, Ohio, Indiana, N.C., S.C., Louisiana No data-center-specific water rule found; general withdrawal rules apply — See table below

Texas

Grid audit and pause (in force). On Aug. 3, 2026, Gov. Greg Abbott directed the Public Utility Commission of Texas and ERCOT to audit data centers moving through ERCOT's interconnection process before approving more connections. His letter asked for projected annual and peak water use, water sources, whether projects bring or reuse their own water, and cooling technology.1 ERCOT sent a request for information to developers of data centers of 25 MW or more, set an Oct. 12, 2026 deadline, and says it will publish a report with the PUCT on or before Dec. 10, 2026. The water questions were written with the Texas Water Development Board.2

TCEQ permit pause (in force). After a Sept. 21, 2026 directive, TCEQ told the governor it had paused permits for infrastructure directly supporting data centers and was screening pending applications and suspending automatic authorizations where possible.3 It also took its STEERS e-permitting system down until about mid-November to route data center filings to staff.4 The watchdog group Public Citizen reported permits still moving after the directive; TCEQ then said those stormwater permits had been suspended.5

Water use survey enforcement (in force). The TWDB Water Use Survey is mandatory for recipients. On Sept. 14, 2026, the governor directed TWDB to enforce it against data centers, including referral to prosecutors and notice to TCEQ, since nonfilers can't get Chapter 11 water-right permits.67 Officials told legislators they had no complete contact list for data center operators, and only about 30% had answered the survey by late August.8

Governor-elect's pledge (campaign pledge, not law). Gina Hinojosa, who takes office Jan. 19, 2027, campaigned on keeping data center approvals paused until the Legislature passes stronger protections, including for community water supplies, limits on nondisclosure agreements, and more local say.910

Groundwater (in force). If a project pumps its own groundwater, the local groundwater conservation district usually permits the wells. Find yours on the TWDB district map.11

Who to ask: ERCOT's RFI questions: DataCenterImpact@ercot.com.2 TWDB Water Use Survey Team: waterusesurvey@twdb.texas.gov, (512) 463-7952.7 TCEQ Public Participation in Permitting (confirmed 2026-11-06): pep@tceq.texas.gov for data center permit questions; permit status search: https://permit-search.tceq.texas.gov/.12

Utah

HB 76 (in force July 1, 2026). New data centers larger than 10,000 square feet that plan to draw 75 acre-feet a year or more must file a pre-construction report 90 to 360 days before construction (location, estimated withdrawal, discharge plans, reuse) and an annual report by July 1 once operating. Before a city or county approves the land use application, it must notify the Division of Water Rights. The division publishes annual reports by Sept. 1. A business can claim most details confidential, but the withdrawal amount stays public. Data centers already operating or under construction before July 1, 2026 are exempt.13

Who to ask: Utah Division of Water Rights (confirmed 2026-11-06), waterrights@utah.gov, 801-538-7240; https://waterrights.utah.gov/data-centers/.1314

Virginia

Utility reporting (in force). HB 496 and SB 553 (2026) require water users that already report withdrawals, and that supply water to others, to report the potable and reclaimed water they deliver each month to data centers holding a DEQ air permit, as separate totals. DEQ's amended rule took effect Sept. 9, 2026.1516

Cooling-water limits (in force; rulemaking pending). State budget language directs DEQ to set criteria for "cooling water scarcity areas" by July 1, 2027, with a focus on the Eastern Virginia Groundwater Management Area. New data centers there that file a complete DEQ air permit application after Jan. 1, 2027 must use air cooling, closed-loop cooling, or 100% recycled water or stormwater for cooling.17 Executive Order 22 (Sept. 18, 2026) directs DEQ to move that work forward.18

Loudoun County. Since March 2025, new data centers need a special exception with a public hearing, which the county says gives the public more visibility into water impacts. The county says data centers account for about 9% of average daily potable water use, and Loudoun Water's reclaimed system delivered more than 750 million gallons in 2025.19 Under a new state law, applicants for large energy-use facilities must assess impacts on water resources, and a September 2026 draft plan and zoning amendment would require surface and groundwater site assessments. The draft is not yet adopted.2021

Prince William County. A Data Center Opportunity Zone Overlay District steers data centers to areas with existing infrastructure. We found no county water-specific data center rule; state reporting still applies.22

Who to ask: DEQ Office of Water Supply Manager Weedon Cloe (primary contact for the HB 496 rule), william.cloe@deq.virginia.gov, (804) 754-5457.16 DEQ Division of Water Planning, Elizabeth.McKercher@deq.virginia.gov, (804) 510-6112.23 Loudoun County government, 703-777-0100.19

New Jersey

Reporting law (in force Aug. 27, 2026). P.L.2026, c.75 (S3379) requires data center owners or operators to report to the Board of Public Utilities every six months: total and peak daily water input, water sources (public system, groundwater or surface water; potable or reclaimed), and energy use.2425 The BPU publishes reported information within 30 days, but some submitted details are shielded from the Open Public Records Act.24 First reports are due Nov. 27, 2026 for centers operating at least a year, and Feb. 27, 2027 for others.26 Critics noted there is no independent verification.25

Who to ask: the state's Data Center Municipal Resource Hub lists Ombudsman@bpu.nj.gov for BPU data center questions.27

Arizona

Groundwater rules (in force). Inside an Active Management Area, new non-exempt wells need ADWR approval tied to existing groundwater rights. ADWR approved two wells for Pima County's Project Blue under three grandfathered rights totaling 96.5 acre-feet a year, with annual use reports required. The developer has said the site will move to closed-loop air cooling.28 Search well records by parcel with ADWR's well record search.

Who to ask: ADWR Groundwater Permitting and Wells, permit-wells@azwater.gov, (602) 771-8527.2930

Georgia

Groundwater permit (in force). An EPD permit is required to withdraw more than 100,000 gallons a day of groundwater.31 A data center on a public system is covered by that utility's withdrawal permit.

NDA bill (status unclear). SB 421 (2026) would bar local governments from NDAs that keep utilities from disclosing data center water and energy use. We could not confirm whether it passed.32

Context: in 2026, four Newton County families sued Meta, claiming construction at its Stanton Springs data center sent sediment into their wells. Meta disputes the claims.33 More in will a nearby data center affect my well?

Who to ask: EPD municipal and industrial groundwater withdrawals, Christine.Voudy@dnr.ga.gov, 470-607-2621; surface water, johmar.haye1@dnr.ga.gov, 470-604-9627; general, askepd@gaepd.org.34

Minnesota

Permits (in force). A DNR water use permit is required to withdraw more than 10,000 gallons a day or 1 million gallons a year; water bought from a city system is exempt.35 Since 2025, data centers planning more than 100 million gallons a year of consumptive use must go through a DNR pre-application review, and those exchanges are nonpublic.3637

Who to ask: DNR, info.dnr@state.mn.us, 651-296-6157; water permitting and reporting staff, 651-259-5724; or your DNR area hydrologist.35

Oregon

No statewide data center water law yet. Gov. Tina Kotek's Data Center Advisory Committee held a water session in March 2026, released preliminary learnings in September, closed public comment Oct. 24, 2026, and is drafting recommendations to the governor.3839 In The Dalles, Google's data centers are major water users; the city now releases historical use but keeps future-use projections confidential, according to The Oregonian.40

Who to ask: to sign up for committee updates, email datacenter.ac@oregon.gov. Oregon Department of Energy, 503-378-4040.38

Florida

Marion County moratorium (in force). On Sept. 15, 2026, commissioners adopted a moratorium of up to 365 days on rezonings, permits and site plans for data centers with 50 MW or more of peak load in unincorporated Marion County. Staff will study groundwater, utilities and cooling before proposing new rules.4142

Levy County moratorium (in force). Ordinance 2026-05 halts data center applications in unincorporated Levy County through Sept. 30, 2027, while staff study Floridan Aquifer, groundwater, cooling, wastewater and drought impacts.4344

Water management districts (in force). A data center that pumps its own water needs a district permit. The St. Johns River district requires a Consumptive Use Permit.45 In the Southwest Florida district, a water use permit is needed at 100,000 gallons a day (annual average) or more.48

Who to ask: Marion County Public Relations (confirmed 2026-11-06 by Growth Services Director Chuck Varadin): PublicRelations@MarionFL.org, 352-438-2300; county data-centers page.4950 St. Johns River WMD (confirmed 2026-11-17 by Regulatory Support Manager Shannon Barican): the preferred way to check Consumptive Use Permit status is the ePermit Portal (https://permitting.sjrwmd.com/ep/#/ep; the Search menu covers CUP applicants/permits and compliance items); permitting rules and documents are at https://www.sjrwmd.com/documents/permitting/. For questions, the listed contact is still permitting@sjrwmd.com, 386-329-4570.454647

Also watch: Pennsylvania and Idaho

We haven't yet verified a public contact for either.

States with no data-center-specific water rule found

In these states we found no enacted rule aimed at data center water as of our last check. General withdrawal rules still apply; see who regulates big groundwater pumpers for thresholds in more states.

State Bills we found General rule that applies Who to ask
Iowa HF 2690 (formerly HF 2447), quarterly data center water reports to DNR, died when the session ended May 3, 202654 DNR water use permit to withdraw 25,000 gallons or more in a day55 Michael.Anderson@dnr.iowa.gov, 515-725-033655
Ohio HB 784 and SB 378 (March 2026) proposed56 Register with ODNR if able to withdraw over 100,000 gallons a day; report yearly57 Bradley.Lodge@dnr.ohio.gov (high-capacity permits)57
Indiana HB 1043 (data center consumption permit) failed56 Register with DNR if able to pump over 100,000 gallons a day; report yearly58 Division of Water web form; 317-232-416059
North Carolina SB 730 (water standards, evaporative cooling ban) proposed56 Permit above 100,000 gallons a day in 15 Central Coastal Plain counties60 DEQ capacity use staff contacts page60
South Carolina S.724 (water-use reports) failed; HB 4583 (closed-loop mandate) proposed5632 Permit or registration above 3 million gallons a month of groundwater61 info@des.sc.gov, (803) 898-343261
Louisiana HB 1206 (data center water permitting and reporting) failed April 202656 State Ground Water Resources Program Gwater@la.gov, (225) 342-824462

Bill status in this table comes partly from SAVRN's data center water tracker, an independent tracker that links each entry to its primary source. Confirm on the state legislature's site.

How to get the latest update yourself

  1. Ask the agency above in writing. Ask: what applies to data centers now, what's pending, and whether there is an email list or docket to follow.
  2. Ask your city or county planning office whether a data center application is pending, and whether it will need a special exception, rezoning or hearing.
  3. Ask your water utility (if you're on city water) whether a data center has applied for service, at what peak and annual volume, and how the utility's drought plan treats large customers.
  4. Ask your groundwater district or state permitting office (if you're on a well) whether any high-capacity well applications are pending near you.
  5. Bring the audit questions. Use the checklist in data center water-supply audits at hearings.

Corrections and agency updates

Agency staff: if a contact or rule here is out of date, or you'd like us to list a different public contact for data center water updates, email Dgovil.home@gmail.com with the page link. We only list contacts you publish or confirm.

Frequently asked questions

Does a reporting law limit how much water a data center can use? No. Reporting laws in Utah, New Jersey, Virginia and Pennsylvania make volumes visible, but don't cap use. Caps and limits come from withdrawal permits, utility contracts, local zoning, or rules like Virginia's cooling-water limits and Idaho's H 895.1324151753

Is a moratorium the same as a water audit? No. A pause stops approvals while officials study the issue. What they study varies. Texas's audit mixes grid, tax and water questions; Marion and Levy counties list aquifer and cooling studies.14143 See what an audit should check.

If I'm on city water, do these rules affect me? Often, yes. Most data centers buy water from public systems, so the reporting laws that cover utility sales (Virginia) or data center water sources (New Jersey) are where city-water customers can see volumes.1524 For what's at your own faucet, see how to test city tap water (CCR first, then a certified-lab spot-check) — separate from rates and drought rules.

Why isn't my state listed? We started with the states in the news most often. Tell us about a rule we missed, with a link to the official source, and we'll add it.


  1. Office of the Texas Governor, letter from Gov. Greg Abbott to PUCT Chairman Thomas Gleeson and ERCOT CEO Pablo Vegas, Aug. 3, 2026 (PDF). https://gov.texas.gov/uploads/files/press/Thomas_Gleeson_Pablo_Vegas_Data_Centers_Directive_Letter_to_PUCT_ERCOT_August_2026_.pdf ↩↩

  2. ERCOT, "Data Center Impact RFI." https://www.ercot.com/about/legal/data-center-impact-rfi ↩↩

  3. TCEQ, letter to Gov. Greg Abbott responding to the Sept. 21 directive on data centers, Oct. 19, 2026 (PDF). https://www.tceq.texas.gov/downloads/response/tceq-response-gov-abbott-dc-directive.pdf ↩

  4. TCEQ, "STEERS Is Temporarily Down." https://www.tceq.texas.gov/agency/steers-down ↩

  5. "Watchdog group criticizes TCEQ for advancing data center permits," Texas Tribune, Oct. 20, 2026. https://www.texastribune.org/2026/10/20/data-center-permits-tceq-abbott-texas-pause/ ↩

  6. Office of the Texas Governor, "Governor Abbott Directs TWDB To Penalize Data Center Reporting Failures." https://gov.texas.gov/news/post/governor-abbott-directs-twdb-to-penalize-data-center-reporting-failures ↩

  7. Texas Water Development Board, "Water Use Survey." https://www.twdb.texas.gov/waterplanning/waterusesurvey/ ↩↩

  8. "There's No Comprehensive Mailing List for All Texas Data Center Operators," Inside Climate News, Sept. 3, 2026. https://insideclimatenews.org/news/03092026/texas-no-mailing-list-for-data-centers/ ↩

  9. Emily Foxhall, "Gina Hinojosa won the governor's race. What happens to Texas data centers now?," Texas Tribune, Nov. 4, 2026. https://www.texastribune.org/2026/11/04/data-center-texas-pause-gina-hinojosa-governor-policies/ ↩

  10. "Texas governor-elect Gina Hinojosa promises continued data center moratorium, further legislation," DatacenterDynamics, Nov. 2026. https://www.datacenterdynamics.com/en/news/texas-governor-elect-gina-hinojosa-promises-continued-data-center-moratorium-further-legislation/ ↩

  11. Texas Water Development Board, "Groundwater Conservation Districts." https://www.twdb.texas.gov/groundwater/conservation_districts/ ↩

  12. TCEQ, "Email Us" directory. https://www.tceq.texas.gov/agency/directory/emailboxes.html ↩

  13. Utah Division of Water Rights, "Large Data Center Water Use Reporting." https://waterrights.utah.gov/data-centers/ ↩↩↩

  14. Utah Division of Water Rights, home page contact information. https://waterrights.utah.gov/ ↩

  15. Virginia Acts of Assembly, 2026 Session, Chapter 623 (HB 496), amending § 62.1-44.38 (PDF). https://lis.blob.core.windows.net/files/1221621.PDF ↩↩↩

  16. Virginia Regulatory Town Hall, "Water Withdrawal Reporting [9 VAC 25-200]: Amendments in response to Chapters 623 and 896 of the 2026 Acts of Assembly (HB496/SB553)." https://townhall.virginia.gov/l./ViewAction.cfm?actionid=7044 ↩↩

  17. Virginia budget, HB 30 Conference Report, Item 366 #7c, "(DEQ) Data Center Cooling Water Scarcity Area Regulations." https://budget.lis.virginia.gov/amendment/2026/2/HB30/Enrolled/CR/366/7c/ ↩↩

  18. Office of the Governor of Virginia, Executive Order 22 (2026), Virginia Data Center Accountability Framework (PDF). https://www.governor.virginia.gov/media/governorvirginiagov/governor-of-virginia/pdf/eo/eo-22-establishing-va-data-center-accountability-and-ai-initiatives.pdf ↩

  19. Loudoun County, "Data Centers: Water Considerations." https://www.loudoun.gov/6402/Water-Considerations ↩↩

  20. "Loudoun County adds new requirements for data center applications," WJLA 7News. https://wjla.com/news/local/loudoun-county-adds-new-requirements-data-center-applications-energy-use-facilities-virginia-law-substations-impacts-water-resources-farmland-parks-historic-sites ↩

  21. Loudoun County, "Summary of Proposed Amendments ... Data Center Standards and Locations Phase 2 (CPAM-2025-0001, ZOAM-2025-0002)," September 2026 (PDF). https://www.loudoun.gov/DocumentCenter/View/222461/Draft-Data-Center-Standards-Project-Narrative-and-Amendment-Summary ↩

  22. Prince William County, "Zoning Overlay Districts." https://www.pwcva.gov/department/zoning-administration/zoning-overlay-districts ↩

  23. Virginia DEQ, "Water Quantity." https://www.deq.virginia.gov/water/water-quantity ↩

  24. New Jersey Legislature, S3379 (2026–2027 session), approved as P.L.2026, c.75, and bill text. https://www.njleg.state.nj.us/bill-search/2026/S3379, https://pub.njleg.state.nj.us/Bills/2026/S3500/3379_R1.HTM ↩↩↩↩

  25. Sophie Nieto-Munoz, "Data centers must report water, energy use under new law signed by Gov. Sherrill," New Jersey Monitor, Aug. 27, 2026. https://newjerseymonitor.com/2026/08/27/data-centers-water-energy-use-law/ ↩↩

  26. Day Pitney, "New Jersey Enacts Energy and Water Reporting Requirements for Data Centers." https://www.daypitney.com/epc/article/print/12000 ↩

  27. New Jersey Economic Development Authority, "Data Center Municipal Resource Hub." https://www.njeda.gov/datacenterta/ ↩

  28. Katya Mendoza, "Arizona water officials approve wells tied to Project Blue data center," AZPM News, May 28, 2026. https://news.azpm.org/p/environmentnews/2026/5/28/229919-arizona-water-officials-approve-wells-tied-to-project-blue-data-center/ ↩

  29. Arizona Department of Water Resources, "Permitting and Wells Overview" and "Contact Us." https://www.azwater.gov/permitting-wells, https://www.azwater.gov/adwr-contact-us ↩

  30. National Ground Water Association, "Arizona" state resources (ADWR Groundwater Permitting and Wells Unit contact). https://www.ngwa.org/connect-with-your-state/State-Resources/arizona ↩

  31. Georgia Rules and Regulations 391-3-2-.03, "Permit Required." https://rules.sos.ga.gov/gac/391-3-2 ↩

  32. Kim Miller, "State Data Center Water Usage Legislation Gains Momentum," MultiState, March 3, 2026. https://www.multistate.us/insider/2026/3/3/state-data-center-water-usage-legislation-gains-momentum ↩↩

  33. Dylan Jackson and Zachary Hansen, "Georgia families sue Meta, accuse its data center of tainting their water," Atlanta Journal-Constitution, Sept. 1, 2026. https://www.ajc.com/news/2026/09/georgia-families-sue-meta-accuse-its-data-center-of-tainting-their-water/ ↩

  34. Georgia EPD, "Water Withdrawal Permitting" (contacts). https://epd.georgia.gov/water-withdrawal-permitting ↩

  35. Minnesota DNR, "Water use permits." https://www.dnr.state.mn.us/waters/watermgmt_section/appropriations/permits.html ↩↩

  36. Minnesota Statutes § 103G.265, subd. 5 (2025). https://www.revisor.mn.gov/statutes/2025/cite/103G.265/subd/103G.265.5 ↩

  37. Minnesota House Research, Act Summary, 2025 First Special Session Chapter 12 (H.F. 16) (PDF). https://www.house.mn.gov/hrd/as/94/2025-1/as012.pdf ↩

  38. Oregon Department of Energy, "Oregon Data Center Advisory Committee." https://www.oregon.gov/energy/get-involved/pages/oregon-data-center-advisory-committee.aspx ↩↩

  39. Oregon Data Center Advisory Committee, "Preliminary Learnings and Questions," Sept. 10, 2026 (PDF). https://www.oregon.gov/energy/get-involved/Documents/2026-09-10-DCAC-Preliminary-Learnings.pdf ↩

  40. "Google's data centers drink more Oregon water, bringing fresh concerns over secrecy," The Oregonian/OregonLive, April 2026. https://www.oregonlive.com/silicon-forest/2026/04/more-oregon-water-for-googles-data-centers-more-concern-over-secrecy.html ↩

  41. Marion County Board of County Commissioners, File 2026-24265, public hearing on a temporary data center moratorium, Sept. 15, 2026. https://marionfl.legistar.com/LegislationDetail.aspx?GUID=DD43C2FF-7419-4A73-B9BD-2A08F89914E0&ID=8205988&Options=&Search= ↩↩

  42. "Marion County approves 12-month moratorium on large-scale data centers," Ocala-News.com, Sept. 16, 2026. https://www.ocala-news.com/2026/09/16/marion-county-approves-12-month-moratorium-on-large-scale-data-centers/ ↩

  43. Levy County, Ordinance 2026-05, temporary moratorium on data center facilities (PDF). https://mccmeetingspublic.blob.core.usgovcloudapi.net/levyfl-meet-a106d2b40d91493fa736cfe8000ff12d/ITEM-Attachment-001-99388d3b2241462a89283a4bf8118270.pdf ↩↩

  44. "Levy County approves moratorium on data centers," Citrus County Chronicle. https://www.chronicleonline.com/news/local/levy-county-approves-moratorium-on-data-centers/article_177dad48-7ddc-55b8-a945-cedb2a3a0013.html ↩

  45. St. Johns River Water Management District, "Permitting: Contacts." https://www.sjrwmd.com/permitting/contacts/ ↩↩

  46. St. Johns River Water Management District, ePermit Portal. Confirmed November 2026 as the preferred way to check Consumptive Use Permit status (Search menu: CUP applicants/permits and compliance items). https://permitting.sjrwmd.com/ep/#/ep ↩

  47. St. Johns River Water Management District, "Permitting" documents (rules and documents). https://www.sjrwmd.com/documents/permitting/ ↩

  48. Fla. Admin. Code R. 40D-2.041, "Permits Required" (via Cornell LII). https://www.law.cornell.edu/regulations/florida/Fla-Admin-Code-Ann-R-40D-2-041 ↩

  49. Marion County, "Data Centers" (Planning & Zoning / Growth Services). https://www.marionfl.org/agencies-departments/departments-facilities-offices/growth-services/planning-zoning/data-centers ↩

  50. Marion County, "Departments, facilities, & offices." https://www.marionfl.org/agencies-departments/departments-facilities-offices ↩

  51. Pennsylvania Fiscal Code, Article XVIII-B, Section 1813-B, "Reporting requirements" (added by Act 21 of 2026). https://www.palegis.us/statutes/unconsolidated/law-information/view-statute&txtType=PDF&SessYr=1929&SessInd=0&ActNum=0176.&chpt=018B&subchpt=000.&sctn=013.&subsctn=000. ↩

  52. "State keeps tabs on data centers," Altoona Mirror, July 2026. https://www.altoonamirror.com/news/local-news/2026/07/pa-ai-datacenters-state-keeps-tabs/ ↩

  53. Idaho Legislature, House Bill 895 (2026), Session Law Chapter 291. https://legislature.idaho.gov/sessioninfo/2026/legislation/h0895/ ↩↩

  54. Iowa Legislature, Bill History for House File 2690 (formerly HF 2447), and Daily Iowan, "Iowa lawmakers, candidates, discuss data center policies ahead of election," Nov. 2, 2026. https://www.legis.iowa.gov/legislation/billTracking/billHistory?billName=HF2690&ga=91, https://dailyiowan.com/2026/11/02/iowa-lawmakers-candidates-discuss-data-center-policies-ahead-of-election/ ↩

  55. Iowa DNR, "Water Allocation & Use." https://www.iowadnr.gov/environmental-protection/water-quality/water-supply-engineering/water-allocation-use ↩↩

  56. SAVRN, "Data Center Water Tracker Update: September 23, 2026" (independent tracker; each entry links to its primary source). https://savrn.com/blog/data-center-water-tracker-update-2026-09-23 ↩↩↩↩↩

  57. Ohio DNR, "Withdrawal Reporting & Facility Registration." https://ohiodnr.gov/discover-and-learn/safety-conservation/about-odnr/water-resources/water-inventory-planning/withdrawal-reporting-facility-registration/withdrawal-reporting-facility-registration ↩↩

  58. Indiana DNR Division of Water, "Significant Water Withdrawal Facility Registration." https://www.in.gov/dnr/water/water-availability-use-rights/significant-water-withdrawal-facility-registration/ ↩

  59. Indiana DNR Division of Water, "Contact Us." https://www.in.gov/dnr/water/contact-us/ ↩

  60. NC DEQ Division of Water Resources, "Central Coastal Plain Capacity Use Area (CCPCUA) Water Withdrawal Permit." https://www.deq.nc.gov/about/divisions/water-resources/groundwater-resources/central-coastal-plain-capacity-use-area-ccpcua-water-withdrawal-permit ↩↩

  61. South Carolina Department of Environmental Services, "Groundwater Use Reporting." https://des.sc.gov/programs/bureau-water/groundwater-management-planning/groundwater-use-reporting ↩↩

  62. Louisiana Office of Conservation, "Ground Water Resources Program" (archive site). https://denr.louisiana.gov/page/gwr-program-page ↩