Data centers use water in two ways: on site, mostly to cool servers, and indirectly, through the power plants that make their electricity. Most get their on-site water from a city or public water system, though some use recycled wastewater or their own wells. This overview covers how much they use, where it comes from, and the permits and new reporting laws that apply. If you're on a private well near a proposed site, start with Will a nearby data center affect my well? and what to test before it opens.

How much water do data centers use?

Nationally: Lawrence Berkeley National Laboratory's 2024 report to Congress estimates that U.S. data centers consumed about 66 billion liters (about 17 billion gallons) of water on site in 2023, mostly for cooling. Large hyperscale and colocation facilities made up 84% of that. The water consumed generating their electricity was nearly 800 billion liters (about 211 billion gallons), roughly 12 times the on-site figure.1

One facility: use varies widely with size, cooling design and climate.2 Some published reference points:

Consumption vs withdrawal: "consumption" is water that evaporates and isn't returned. In evaporative cooling, most of the water drawn is evaporated, and the rest leaves as wastewater ("blowdown").23

Cooling: evaporative vs air and closed-loop

Example: the Project Blue data center near Tucson moved from a water-cooled design to closed-loop air cooling. The developer now estimates about 15,000–20,000 gallons a day once it's operating.7

Where the water comes from

What water quality does cooling need?

Cooling systems need water that won't leave mineral scale, corrode metal or grow bacteria and biofilm. CRS notes that water from a regulated public water system generally works. Data centers that use groundwater or reclaimed water may need to pretreat it first.3 As water evaporates, minerals concentrate, so some water must be drained (blowdown) and replaced. Operators use chemical and mechanical treatment to recirculate it more times before draining, and cooling towers need a Legionella water management program. Details are in How data centers treat cooling water. How that water is tested (conductivity, corrosion coupons, Legionella) is covered in Data centers and water testing.

Permits and rules

Withdrawals (state and local). Congress has generally left water allocation to the states. A data center that pumps its own water is subject to state groundwater and surface-water law, and that varies widely.3 For example, Georgia requires an EPD permit above 100,000 gallons a day of groundwater.10 Minnesota requires a DNR permit above 10,000 gallons a day or 1 million a year.11 In Texas, local groundwater conservation districts issue the permits.12 More examples are on the private wells page, and a 13-state table of thresholds and where to search applications is in who regulates big groundwater pumpers.

Discharges (Clean Water Act). According to CRS, data centers most often send wastewater to a municipal treatment plant, which makes them "indirect dischargers" under EPA's National Pretreatment Program, mostly enforced by the local utility. A data center discharging directly to a river or stream would need its own NPDES permit. Construction can also require stormwater permits and, if wetlands or streams are filled, Section 404 permits.3

Reporting and disclosure laws (new).

What isn't known

Frequently asked questions

Do data centers use drinking water? Most use water from public systems, which is treated to drinking water standards. Some use reclaimed wastewater instead, as in Loudoun County, Virginia, and the planned Memphis plant.389

Is the water used by a data center gone? The part that evaporates leaves the local system as vapor. The rest is usually discharged as wastewater to a treatment plant.23

Is air cooling always better for water? It uses little water on site, but more electricity, and power plants use water too. LBNL says the tradeoff depends on the site.1

Where can I see how much a specific data center uses? Check state reporting programs (Utah publishes annual reports; New Jersey reports go to the BPU), company sustainability reports, and local utility or council records.13146


  1. Shehabi et al., Lawrence Berkeley National Laboratory, "2024 United States Data Center Energy Usage Report" (LBNL-2001637, December 2024), sections 4–5. https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf ↩↩↩↩↩↩

  2. National Ground Water Association, "FAQ Sheet: Data Centers and Groundwater" (2026) (PDF). https://www.ngwa.org/docs/default-source/default-document-library/faq-data-centers-and-gw_final.pdf ↩↩↩↩

  3. Congressional Research Service, "Data Centers and Water: Frequently Asked Questions" (R49057, July 31, 2026). https://www.congress.gov/crs-product/R49057 ↩↩↩↩↩↩↩↩↩↩↩↩↩

  4. Kirsti Marohn, "Water-guzzling data centers spark worries for Minnesota's groundwater," MPR News, Feb. 11, 2025. https://www.mprnews.org/story/2025/02/11/water-guzzling-data-centers-spark-worries-for-minnesotas-groundwater ↩

  5. Eli Tan, "Their Water Taps Ran Dry When Meta Built Next Door," The New York Times, July 14, 2025. https://www.nytimes.com/2025/07/14/technology/meta-data-center-water.html ↩

  6. Google, "2026 Environmental Report" (PDF), water section. https://sustainability.google/files/google-2026-environmental-report.pdf ↩↩

  7. Katya Mendoza, "Arizona water officials approve wells tied to Project Blue data center," AZPM News, 2026. https://news.azpm.org/s/103423-arizona-water-officials-approve-wells-tied-to-project-blue-data-center/ ↩↩

  8. Loudoun Water, "Reclaimed Water Program." https://www.loudounwater.org/commercial-customers/reclaimed-water-program ↩↩

  9. Tennessee Department of Environment and Conservation, Division of Water Resources, "Fact Sheet on Water Quality State Operating Permit SOP-24025, Colossus Water Recycling Plant" (2025) (PDF). https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=429269970050101217 ↩↩

  10. Georgia Rules and Regulations 391-3-2-.03, "Permit Required." https://rules.sos.ga.gov/gac/391-3-2 ↩

  11. Minnesota DNR, "Water use permits." https://www.dnr.state.mn.us/waters/watermgmt_section/appropriations/permits.html ↩

  12. Texas A&M AgriLife Extension, "Basics of Texas Water Law." https://mytexas.ag.tamu.edu/publications/basics-of-texas-water-law/ ↩

  13. Utah Division of Water Rights, "Large Data Center Water Use Reporting." https://waterrights.utah.gov/data-centers/ ↩↩

  14. Sophie Nieto-Munoz, "Data centers must report water, energy use under new law signed by Gov. Sherrill," New Jersey Monitor, Aug. 27, 2026. https://newjerseymonitor.com/2026/08/27/data-centers-water-energy-use-law/ ↩↩

  15. Virginia Acts of Assembly, 2026 Session, Chapter 623 (HB 496), amending § 62.1-44.38 (PDF). https://lis.blob.core.windows.net/files/1221621.PDF ↩

  16. Minnesota Statutes § 103G.265, subd. 5 (2025). https://www.revisor.mn.gov/statutes/2025/cite/103G.265/subd/103G.265.5 ↩

  17. Minnesota House Research, Act Summary, 2025 First Special Session Chapter 12 (H.F. 16) (PDF). https://www.house.mn.gov/hrd/as/94/2025-1/as012.pdf ↩